How much power? What density? The IT Pod Sizing Calculator can help answer these data center questions.
Let’s start with the first question… how much power can my IT space support? Often times, the available power feeds (the input voltage and breaker size) are constraints within the IT space of a data center. These power feeds determine the maximum power capacity provided to each IT pod (a pod is generally defined as 2 rows of racks being fed from a common distribution point). For instance, if I have 208/120V 3-phase power coming into my IT space, and my input breaker is rated at 225A, I can get 65 kW of power out of that breaker. Here’s the math: Power (kW) = [3-ph voltage x 1.732 x the breaker rating in amps x the derating of the breaker] / 1,000; so [208 x 1.732 x 225 x 0.8] / 1,000 = 65 kW On the other hand, if my input voltage was 415/240V, with the same input breaker size, I can get 130 kW of power. (415/240V distribution allows you to get twice the power.) The amount of power you can get from a particular breaker is one of the key outputs of our IT ...